Build log, 2026-11-19 morning (9:30 pm to 9:15 am)
What changed from 21:30 on 2026-11-18 to 09:15 on 2026-11-19, with status. A new try-out build with a calendar update, Gmail-style mail, editing together, publishing and Drive links, plus the work still in progress.
Previous log: evening of 2026-11-18.
At a glance
"Done" means merged and checked, or live in the try-out and checked. Things built but not merged are labelled "in progress".
| Item | Value |
|---|---|
| nanumos.com | answers |
| Server backups | 7 places, oldest copy 4 hours old, restore test passed |
| Visitors in the current window | 260 people, 233 of them arriving directly; robots counted apart (813 visits) |
Done (live in the try-out and checked)
- A new try-out build went live this morning. It carries the calendar update, mail that looks and behaves like a familiar web mail, editing a document together at the same time, publishing to the web, and links to share files from Drive.
- Before it went live it passed three checks: moving from an older build to the new one with all your data kept, every app opening, and the assistant opening apps.
In progress
- A boot fix for the kernel when it runs with a small amount of memory under hardware virtualisation. It fails to start there today, and the fix is being written.
- A single searchable index of everything on the device. Your originals stay as ordinary files; the index sits beside them.
- The calendar update, mail and editing-together work above is live in the try-out but is not merged into the main code yet.
Not done yet
- The Windows try-out: apps still do not open there.
- Mail sending comes later.
Next
- Merge the try-out work into the main code.
- Land the kernel boot fix.
- Start the device-wide index.
No video today; I post a short clip once or twice a week.
#NanumOS #BuildLog #SoloDev #TryOut
NanumOS 0.1.15511 · 2026-11-25